- Client
- Orbitly
- Sector
- SaaS
- Year
- 2025
- Timeline
- 8 weeks
- Team
- 1 designer, 2 engineers
- Services
- Web Development
- 0.8smedian load time on mobile
- +41%demo requests
- 0developer tickets for new pages
The challenge
Every landing page needed a developer, so campaigns waited weeks. The old site was also slow on mobile, which hurt paid traffic.
What we did
A kit, not pages
We built 24 content blocks the growth team can combine into new pages in the CMS.
Fast by default
Static pages, optimised images and no unused scripts. Every block is tested for speed and accessibility.
Train the team
Two hands-on sessions and short videos, so the team shipped its first page without us in week one.
“Our marketing site finally loads fast and converts — and the team can edit everything without a developer.”
Lena Fischer
Growth Lead, Orbitly